Where I live, a pole barn with a concrete floor cost more in yearly taxes. I want to build a new pole barn next year. I want to keep my taxes low. So, is it possible to build a pole barn without a concrete floor, have it signed off by the inspector and then pour the floor at a later date?????????

Bob
 
   / Concrete floor before or after? #2  
Sure.

In fact, the floor was the last step with my PB.
 
   / Concrete floor before or after? #4  
I think a lot of pole barns are built with the floor last. Out here, tax wise, we have the same situation when including water or electricity in an out building.

The decision you'll need make may be based on if you ever expect to have the inspector back to look at an addition, or something else, on that pole building. Then if he catches you've added a concrete floor you may be liable for the permit plus fines. The fine here is double the permit fee.

One thing for sure, if you do the floor without inspection, take good photo documentation in case the issue arises in the future or you want to convince a prospective buyer the job was well done even though not done under the building permit.

Here too we'd need to disclose the non-permit floor to a prospective buyer. Even if you plan to keep your place "forever" someone at sometime may need to deal with this.
 
   / Concrete floor before or after? #6  
I think a lot of pole barns are built with the floor last. Out here, tax wise, we have the same situation when including water or electricity in an out building.

The decision you'll need make may be based on if you ever expect to have the inspector back to look at an addition, or something else, on that pole building. Then if he catches you've added a concrete floor you may be liable for the permit plus fines. The fine here is double the permit fee.

One thing for sure, if you do the floor without inspection, take good photo documentation in case the issue arises in the future or you want to convince a prospective buyer the job was well done even though not done under the building permit.

Here too we'd need to disclose the non-permit floor to a prospective buyer. Even if you plan to keep your place "forever" someone at sometime may need to deal with this.
I'm glad we don't have to put up with codes and crap like this here in Washington County.
 
   / Concrete floor before or after? #7  
I guess I thought that all pole buildings had the floor poured last. (If they were getting a floor)
 
   / Concrete floor before or after? #8  
I think the biggest disadvantage to pouring the floor later is that all the stuff that will have to be moved to do the pour increase the odds that it will never get poured. My barn resembles that remark. MikeD74T
 
   / Concrete floor before or after? #9  
I poured my concrete floor last in my 30X50 pole barn on purpose. That way the bottom kicker boards around the whole barn act as a mold for your concrete when it's poured. The only thing I'd say is to be careful when you pour the concrete and don't splash any of it up onto the walls. Also, depending on what big doors you're planning on having in your barn, sliding to open or up and down, be sure to take the concrete out enough to meet flush with them when they close. I also added a small concrete pad in front of the walk in door too. I poured my concrete 4 inches thick, using cattle panel as reinforcement in the concrete. Don't forget expanders either. Never have had a problem with it since it was poured in 99.
 
   / Concrete floor before or after?
  • Thread Starter
#10  
I guess I thought that all pole buildings had the floor poured last. (If they were getting a floor)

I have never built a pole barn. I just assumed that the floor was poured before the walls etc were completed.
Bob
 
   / Concrete floor before or after? #11  
I've done them both ways. Well sorta. I've been inside a finished barn and poured the floor troubles are:

1) Getting the mud to the floor. Since the pole barn may not be tall enough for the concrete truck you'll need pumps or wheelbarrows.
2) Floating it. With walls in the way you can't just use the long poles to float the floor as easily.
3) Access. The guys will be tripping over each other, the chute, the screed has to be set on something. etc.

Advantage is it can be poured as money allows. Might never need it. Might like the fact that oil drips sort of go away, etc.

The last one I poured was done after the poles were set up since the slab is poured around the poles you need to at least have the poles in. It was much easier without walls and having the slab installed made building the rest of the barn more pleasant since we used one of those genie scissor lifts and it rolled around easily on the slab.

A pole barn structure is pretty cheap. Skipping the slab means a quick shop can be built on the cheap.
 
   / Concrete floor before or after? #14  
Most of the builders in this area recommend pouring the floor after the posts are set. The bottom boards are your form. It is easier if the metal is not on if it is a long barn. A few builders will do the floor first if requested, but anchors need to be set usually to connect to. On mine, I could not get the concrete crew in before the metal was on, so they did it after it was finished,(don't wait too long long or there will be lots of "stuff" to move;)). The building was not quite tall enough to get the truck in so they used extension chutes and "shot" it to the center from each end. The floor came out very nice and the crew was careful so I only ended up with very minimal splattering on the interior of the metal.
I had the barn crew build sliding doors for my barn instead of using garage style doors. They made the doors 4" lower than the planned floor height and it made a very good seal at the bottom. The concrete buffer on the approach side keeps the doors from blowing out in the wind.(I don't think this approach would work in snow country, it is not a major concern here).
Most of the barn builders here build to recommended codes, no permits or inspection required though, but we had better get things on the property tax rolls or the assesors office gets grumbly.
 
   / Concrete floor before or after? #15  
The only way to build a pole shed that will last and look good forever is to pour the floor first. The treat post rot out in about 10-15 years if they are in the ground. pour the walls put the post on the cement floor and it will last forever.
 
   / Concrete floor before or after? #16  
Haven't poured my floor yet, and now it's full.

Pole barns the floor is last. Steel buildings the floor is poured first with anchors bolts at the column locations. You can use anchors with poles, but you normally install a regular footer system if you go this route.
 

Tractor & Equipment Auctions

JLG 15 MVL MANLIFT (A58214)
JLG 15 MVL MANLIFT...
2014 Forest River Rockwood Premier Pop Up Trailer (A59231)
2014 Forest River...
John Deere 568 Mega Wide Plus (A60462)
John Deere 568...
Rotadairon RD145 Pull-Behind Rotary Tiller Tractor Attachment (A59228)
Rotadairon RD145...
CABINET OF HOSE ENDS (A58214)
CABINET OF HOSE...
2017 Dodge Ram SLT (A55314)
2017 Dodge Ram SLT...
 
Top