Obed
Elite Member
Obed, the flatwork looks very good from here. Must be a great feeling to have that in place. You get to stop staring at a hole in the groundI don't see j-bolts. What's the plan for those?
Did they use screed bars for the troweling?
Dave.
I'm very pleased with the flatwork. Monday evening, David, the flatwork guy, had me run my hands over the concrete to see how smooth it was. He also had me look at the concrete at floor level to see how level it was. He was showing me these things because he was very proud of his work and enjoyed showing it off.
J-anchor bolts were installed after the slab was poured. I'm not quite sure what screed bars look like. I think the pictures show most of the tools in use.
Obed
Last edited: