Deere Dude
Elite Member
- Joined
- Feb 10, 2011
- Messages
- 3,887
- Tractor
- John Deere 3720
So I had to bring in fill for my 20' x 32' pole building. The fill is approximately 6" in front and 30" along the rear of the building. Do I wait until next spring to pour a floor or do it now? Settling ya know?
View attachment 217049 View attachment 217050
I put a 36x54' pole barn in with about 2' of sub oil and had a guy with a big drivable roller that vibrates to compact it better. When he got done it was so hard you couldn't dig in it. Consider that, although it will cost a couple hundred bucks. It will be a lot tighter than you could ever do with your tractor.
In your situation I'm sure you want the roof and sides on quick but then the floor will be out of the weather and it will take longer to compact naturally, if ever. Like another poster said, I would grade it higher on the sides so there is not an immediate drop off. Good luck. It looks like a nice project.:thumbsup::thumbsup: