justinramani
Gold Member
Crusher run, 304's, 411's, 3/4 minus etc is all top coat stuff. (or middle coat). But it dont make a very good base unless you have some real solid and dry clay that stays that way. Around here, we us #2's for base, then the 304's for a top coat to lock it all in. And if you dont like the dust content of the top layer, add to that a thin layer of 8's or 57's, whatever your preference
So here is the plan....
1. Let the area settle for about a week
2. Bring in dozer w/six way blade to shape road and cut ditches for water runoff
3. Lay geotextile fabric.
4. Lay base layer of larger stone.
5. Finish off top with crush and run.