JPRambo
Platinum Member
It has taken a lot of leg work but I am finally getting the power into my property. I did slack off for a long while. But I am planning on retiring next year and thought I should get this done. I could not get in contact with property owner of the path indicated in the graphic I posted so again talked to the neighbor to the south of me. He said since I could not find the owner he was willing to sign all needed paperwork, "IF" i went underground. He would have lost 18 - 20 trees and I would loose many more if I went overhead. Plus East of us is a cow pasture and the trees help hide it a little. I had to agree that I would repair any damage done and left after the crew was finished. I also talked to the crew boss. He said he will not know it was done unless he saw it himself. I am hoping.After many trips to the court house and notary and back and forth I got all the papers into the correct authority and its a go. It is not cheap as I said in post #11 it was $7.25 a foot and turned into 715 feet. Plus another 500 for a security/deposit on the install. But he removed the extra $1000. for non residential. (because i will build next year. It has been scheduled for Thursday. Keep your fingers crossed for me. I am trying to get a weekend to go see if I have any repairs to make.
I did
I did