First is a pic of the drive flange installed, I think that is what they call it. You can also see the pins we made to make installing the planetary housing easier, they are pointed. We got one planetary hole on there, and it held the weight while we got the other holes and planetary gears aligned.
Second is a pic showing the torque wrench, had to make a spindle nut socket, it was not available anymore. Welded an 1-5/16” socket to a plate with pins in it. It calls for 600 ft lbs, then set to 25 lbs rolling torque. Rolling torque was already there at 600 ft lbs, had to use the 9 foot cheater pipe to get the torque.
Third is the planetary housing before cleaning it, we put everything back together clean. I am told planetaries are used to handle the torque better.