Really happy with the progress the last two day. Was able to get in at least 5-6 hours each day and moved a lot of dirt. The dam is now at water height across 2/3 of it. Need to get the pipe ordered for the overflow and then will work on expanding the base of the dam, installing overflow, and building free board. Here's some pics as of this morning. Rain is on the way for the next couple of days.
2020-09-08_11-00-40
2020-09-08_11-01-17
2020-09-08_11-01-26
2020-09-08_11-01-39
2020-09-08_11-02-09




