TnWV
Platinum Member
- Joined
- Apr 29, 2008
- Messages
- 588
- Location
- Liberty,WV - Putnam Co.
- Tractor
- 2003 Zetor 4341 w/FEL, 1970 MF 150, 2012 JD X530
I managed to get the 3 loads of gravel mostly spread. I’ll need another load of 57 to cover the larger gravel, but will let things settle in for a couple weeks before doing that. I did use 57 already where the driveways meet because I needed some gravel there on the main drive to repair where the large trucks have done a number on it throughout the build. I have family that lives over the hill and they use that part of the road as well.
Still have a little bit left to spread and need to dress the edges up some more.

View attachment 679394
Did some more electrical wiring after playing on the tractor. Apparently my 18 volt Milwaukee Fuel drill isn’t up to the task for drilling the studs. May run out at some point tomorrow and get a more powerful right angle drill, that would make the drilling go faster for sure.
Still have a little bit left to spread and need to dress the edges up some more.

View attachment 679394
Did some more electrical wiring after playing on the tractor. Apparently my 18 volt Milwaukee Fuel drill isn’t up to the task for drilling the studs. May run out at some point tomorrow and get a more powerful right angle drill, that would make the drilling go faster for sure.