Heck, I could have done that in a couple of months :)
Looks like a job well done.

Thanks for the numbers.
By your description that might figure up to about 3 plus full days for 2 people and 2 tractors.
 
   / Dig septic bed with front end loader
  • Thread Starter
#72  
Heck, I could have done that in a couple of months :)
Looks like a job well done.

Thanks for the numbers.
By your description that might figure up to about 3 plus full days for 2 people and 2 tractors.
That's about right. Keep in mind that the digging here was easy. Almost 100% sand except for a tree stump that had to be removed.
 

Tractor & Equipment Auctions

2011 Toyota Prius Hatckback (A56859)
2011 Toyota Prius...
Ford 2000 Tractor (A57453)
Ford 2000 Tractor...
(APPROX. 20) 4' X 8' X 3/8" SHEETING (A52706)
(APPROX. 20) 4' X...
2004 VE ENTERPRISES 500BBL FRAC TANK (A58214)
2004 VE...
2023 NEW HOLLAND HYDRAULIC THUMB FOR B95D TLB WITH STANDARD STICK (A57024)
2023 NEW HOLLAND...
DEUTZ MARATHON 60KW GENERATOR (A58214)
DEUTZ MARATHON...
 
Top