Dig septic bed with front end loader

   / Dig septic bed with front end loader #71  
Heck, I could have done that in a couple of months :)
Looks like a job well done.

Thanks for the numbers.
By your description that might figure up to about 3 plus full days for 2 people and 2 tractors.
 
   / Dig septic bed with front end loader
  • Thread Starter
#72  
Heck, I could have done that in a couple of months :)
Looks like a job well done.

Thanks for the numbers.
By your description that might figure up to about 3 plus full days for 2 people and 2 tractors.
That's about right. Keep in mind that the digging here was easy. Almost 100% sand except for a tree stump that had to be removed.
 

Tractor & Equipment Auctions

CHALLENGER MT525B TRACTOR (A59823)
CHALLENGER MT525B...
2007 Isuzu FTR Truck, VIN # 4GTJ7F1357F700209 (A57453)
2007 Isuzu FTR...
Concrete Sealant (A57454)
Concrete Sealant...
500 BBL FRAC TANK (A58214)
500 BBL FRAC TANK...
Champion Walk Behind Concrete Saw (A57454)
Champion Walk...
2013 NISSAN NV3500 CARGO VAN (A59575)
2013 NISSAN NV3500...
 
Top