2305 & Curtis Cab

   / 2305 & Curtis Cab #11  
The first one will take about 7 hours plus what ever accessories you get. The heater took an additional 2 hours. If you do a second one maybe 5 hours will get it done.

I understand that it takes quite a while to install the cab initially. Are you planning to leave it on all year round? I'd expect to remove it for the warmer months. That's what I was hoping to hear about.
 
   / 2305 & Curtis Cab
  • Thread Starter
#12  
I understand that it takes quite a while to install the cab initially. Are you planning to leave it on all year round? I'd expect to remove it for the warmer months. That's what I was hoping to hear about.

I will never take it off because it is very windy here and I don't want to deal with the plumbing for the heater. In the dog days of summer I will take the doors off and maybe the rear window because it doesn't open. It will take longer to find a safe place to store them than it will to remove them.
 
   / 2305 & Curtis Cab #13  
I have a soft side cab on my 2210. Same cab except for the fiberglass doors and rear panel.
It takes about an hour and a half to take it off for the summer and re-install it for the winter. The windshield is a little challenging without a second person.

I put 1/4 turn ball valves on the heater lines. I disconnect the hoses and tuck them behind the engine side panel for the summer.

I put weather pack connectors on the harness for the radio, wiper, cab lights and heater blower motor.

I also have rops lights so I use the same connector and swap it between the rops and cab lights.
 

Tractor & Equipment Auctions

PALLET OF SCAFFOLDING (APPROX. 21 PC) (A52706)
PALLET OF...
JOHN DEERE Z330M Z-TRAK ZERO TURN LAWN MOWER (A54756)
JOHN DEERE Z330M...
2012 JOHN DEERE 410K BACKHOE (A51406)
2012 JOHN DEERE...
TAG 24" EXCAVATOR BUCKET (A54756)
TAG 24" EXCAVATOR...
2023 54' Hooklift Dumpster 15 Cubic Yard (A53422)
2023 54' Hooklift...
UNUSED FUTURE WINDMILL SHAPE METAL SHOOTING TARGET (A54757)
UNUSED FUTURE...
 
Top