L
LarryRB
Guest
one time running the highway dpt and it was this exact size/type rock that caused us endless aggravation,.. If possible, pull as many rocks as you can... Place all of them in the soft area that you are digging out provided this area is on the side of the new drive, fill the holes with gravel that you can scrape up around your new drive,, Then procede to drive back and forth numerous times to help compact,, Wait for 2 weeks or so, then fabric then fill with 2"rock base and gravel.., there are as many ways to attack this as our new england weather changes. In either case, pull out as many of those rocks, small boulders as you can before proceding... You will deal with them over and over especially after the second winter/heave season.