Bills Workshop

   / Bills Workshop
  • Thread Starter
#51  
these do eventually take their toll on the equipment, I lost the dipper cylinder after a few more of these and some more 12" stumps
 

Attachments

  • 691814-IMG_0452.jpg
    691814-IMG_0452.jpg
    88.1 KB · Views: 209
   / Bills Workshop
  • Thread Starter
#52  
we brought in 90 yards of 5" bank gravel for the turning area and driveway base. It is spread about 16" thick.
 

Attachments

  • 691817-IMG_0458.jpg
    691817-IMG_0458.jpg
    91.2 KB · Views: 224
   / Bills Workshop
  • Thread Starter
#53  
here it is roughed in. I didn't take any snaps of it finished and cleaned up because I became preoccupied with taking the cylinders off the BH90 to re-seal. The dipper cylinder that failed was severely side loaded and I will get it apart tomorrow night to see if it can be saved, but that is another subject.
Now we are waiting for the sawmill to finish cutting the package and make the delivery. This will be post and beam using native pine. Should be interesting, I've only ever built with dimensional lumber.
Thanks for looking,
Martin
 

Attachments

  • 691821-IMG_0457.jpg
    691821-IMG_0457.jpg
    84.9 KB · Views: 231

Tractor & Equipment Auctions

1997 Wells Cargo Enclosed S/A Trailer (A50324)
1997 Wells Cargo...
(4) 320 x 90 R50 Tires and Rims (A50514)
(4) 320 x 90 R50...
2001 Sterling L7500 Heil 12Yd T/A Dump Truck (A51692)
2001 Sterling...
2010 Ford Edge SE SUV (A51694)
2010 Ford Edge SE...
(9) 2 PLUG VALVES 1502 IRON (A52472)
(9) 2 PLUG VALVES...
BW RVB3405 20,000lbs 5th Wheel Hitch Base (A50322)
BW RVB3405...
 
Top