kubota4life
New member
I need to build a bridge over a creek on my deer lease. the creek is about 50 feet across and the bridge needs to only hold up ATV's. All otpions are open although I would like the most cost effective way. I need to elevate the bridge maybe 3 feet or so over the water to keep debris from building up against the bridge.