   / Creating an Entrance #61  
Well, it's looking just fine. I had to add my edit of your nighttime shot. John
 

Attachments

  • 506688-eddiewalker.jpg
    506688-eddiewalker.jpg
    83.8 KB · Views: 821
   / Creating an Entrance #62  
Looking very nice Eddie. Wanna come up north and lend a hand with my masonry work?

/forums/images/graemlins/smile.gif
 
   / Creating an Entrance #64  
Eddie, the columns look terrific! /forums/images/graemlins/cool.gif

I had to look long and hard to even come up with a suggestion, but I'm not sure about your footing around the base of the column. Did you leave a ledge to support the rock veneer? If not, you could probably still pour a base footing around the column up to the level of the rock. That will ensure there is always support and also reduce the likelyhood of things constantly bumping into the stone at the base.
 
   / Creating an Entrance
  • Thread Starter
#65  
Jim,

The footings are about two feet deep and dug with my 12 inch post hole digger. Then I built a 2X4 frame around the whole for the concrete. I used sack concrete from Home Depot with rebar. They are 24 inches square and the rock is 21 inches at its widest when done. My first course rests on the footing.

Thanks for the thought,
Eddie
 
   / Creating an Entrance #66  
The day and night shots look great. How come we only get to see one light though /forums/images/graemlins/confused.gif
 
   / Creating an Entrance
  • Thread Starter
#68  
Since my dozer is out of commision for a little while, I decided to get back to this project.

I need a sign at my entrance to let the world know where I'm at, and to impress the **** out of everyone driving by. hahaha

First step was to build up the pad for the footing. I did this months ago. Then I drilled some holes in the ground three feet down to anchor the footing.

Then I didn't do anything for several months and now it's time to dig out the holes and level it out for the forms.


Eddie
 

Attachments

  • 531518-dozer 007.jpg
    531518-dozer 007.jpg
    69.9 KB · Views: 925
   / Creating an Entrance
  • Thread Starter
#69  
Since the sign will be built from cement blocks, it will be very heavy and quite tall, I wanted some overkill. The holes are three feet deep and a foot around. There are four of them. The forms are 2X6's and there's over two hundred feet of rebar in there.

Eddie
 

Attachments

  • 531521-dozer 008.jpg
    531521-dozer 008.jpg
    92.6 KB · Views: 781
   / Creating an Entrance
  • Thread Starter
#70  
This time of year the weather changes on a daily basis and there's no predicting the next time it will rain. Luckily I have my "container barn" to store my sacks of mortor.
 

Attachments

  • 531526-dozer 009.jpg
    531526-dozer 009.jpg
    71.2 KB · Views: 782

Tractor & Equipment Auctions

Neckover GL24-2-7K Gooseneck Trailer  24ft Deck, Dual 7K Axles, 14K GVWR (A51039)
Neckover GL24-2-7K...
2015 Infiniti QX60 SUV (A50324)
2015 Infiniti QX60...
2018 INTERNATIONAL 4400 SBA 4X2 SERVICE TRUCK (A51406)
2018 INTERNATIONAL...
2016 FREIGHTLINER CASCADIA TANDEM AXLE 6X4 MID ROOF SLEEPER TRUCK (A51219)
2016 FREIGHTLINER...
1998 CATERPILLAR IT28G WHEEL LOADER (A51242)
1998 CATERPILLAR...
John Deere 772B Articulated Motor Grader (A49461)
John Deere 772B...
 
Top