I'm prepping out a single lane (15' wide, 3' shallow ditches on either side) 1000' dirt driveway on which I intend to place gravel. The dirt alone was adequate for infrequent personal use, in that I've only once in 3 years had to box blade a few loads of extra dirt on it to fill the shallow tire track grooves. However, a contractor is building a garage/apartment on the property in a few months, and that will mean a bunch more, and much heavier, road traffic - and once the abode is constructed, more frequent visits to the property by me. So, I'm going to apply Roundup and put a nice crown (again) on the driveway, and then gravel it once before the construction, let the trucks pound the new gravel into the roadbed, and then gravel it again. In theory, this should work - but probably won't, given my luck.
Anyhow, what sort of drop-off between the crown and side of the road should I shoot for, and does being a dirt/gravel road make any difference (vs. the current dirt alone)? And, as long as folks are feeling generous with advice, what size gravel should I use for the first and/or second applications?
Anyhow, what sort of drop-off between the crown and side of the road should I shoot for, and does being a dirt/gravel road make any difference (vs. the current dirt alone)? And, as long as folks are feeling generous with advice, what size gravel should I use for the first and/or second applications?