rdam
Gold Member
Sorry I made such a big deal about the culvert. After I re-filled in the hole I so skillfully dug out, I placed the culvert at the original grade (read that as wasted time, but good FEL training).
One load of fill dirt and one load of crushed lime rock...graded it out nice so there's only a small hump. I'm so proud !!! I had a great time doing it and really improved my FEL skills (moved 36 tons of material).
I need to put cement on the mitred ends and I'm done.
One load of fill dirt and one load of crushed lime rock...graded it out nice so there's only a small hump. I'm so proud !!! I had a great time doing it and really improved my FEL skills (moved 36 tons of material).
I need to put cement on the mitred ends and I'm done.