I very big thank you to all the input on this. I talked with a contractor friend of mine. He came out and shot some elevations on the pad site. He told me we will need to remove about 5 feet of dirt front the back section of the pad and add 2 feet to the front. We are going to be a tag team, I am going to clear the area of light brush and debris left around. Then he is going to loosen up the dirt with his excavator while I move it. He will use his track dozier to finish grade the area and move the 3 ton rock at the edge of the pad. I was not going to move it but since he is digging down so much we got to move it. Thanks again for all your help!!!!