I very big thank you to all the input on this. I talked with a contractor friend of mine. He came out and shot some elevations on the pad site. He told me we will need to remove about 5 feet of dirt front the back section of the pad and add 2 feet to the front. We are going to be a tag team, I am going to clear the area of light brush and debris left around. Then he is going to loosen up the dirt with his excavator while I move it. He will use his track dozier to finish grade the area and move the 3 ton rock at the edge of the pad. I was not going to move it but since he is digging down so much we got to move it. Thanks again for all your help!!!!
 
/ Dirt Work #33  
I've only done some minor grading with my 45 hp Massey with no FEL. What has worked for me is to use my 5 ft. tiller to loosen up about 6" of top soil then move it with my blade. Then repeat the process as necessary.
 
/ Dirt Work
  • Thread Starter
#34  
Hi All,

An update, I got a box blade from Tractor Supply 6' and I love it was able to do about 85% of the grading with it and my FEL. I was able to do so much that my contractor knocked $500 off the price to do the finish grading! I love this blade it is built like a tank! Now the building is up and I got some place to work on my tractor! Thank again to all for all your advise!!
 

Marketplace Items

2019 CHEVROLET SILVERADO CREW CAB TRUCK (A59823)
2019 CHEVROLET...
2016 Ford Explorer AWD SUV (A59231)
2016 Ford Explorer...
2015 Freightliner M2 106 AWD Altec AT37G Bucket Truck (A60460)
2015 Freightliner...
Great Dane Van Trailer 1989 (A61307)
Great Dane Van...
2018 John Deere TX (A53317)
2018 John Deere TX...
New/Unused CFG Industrial QK18R Mini Excavator (A61166)
New/Unused CFG...
 
Top