Doorman’s next big adventure

   / Doorman’s next big adventure
  • Thread Starter
#81  
Eddie
Todays forecast
6866D3D2-111B-43F4-ADCE-D00A9202B22C.png


Progress so far today

EFCEDB78-4BCB-4CFD-B011-CAE6BA2A2071.jpegFA47BA63-052B-44EA-A36D-B8F821682E95.jpeg
 
   / Doorman’s next big adventure #82  
Those temps sound amazing!!!! Wish we where in the 80's!!!!
 
   / Doorman’s next big adventure
  • Thread Starter
#84  
More progress!!!24C5F8FA-AE74-4FE3-85DF-4524B87A197E.jpeg2FE3AF4A-A025-4151-A623-85B9B6F1F0FA.jpeg4F29390C-879C-42CB-A30F-24BE4ABF1593.jpegD4047C1D-FA4C-438C-90C8-C2FB2832C6D4.jpeg


Builder says main shell will be complete by Tuesday July 11

Front porch/lean to completed shortly after

Insulation contractor scheduled for Thursday July 13

Septic trench should be started tomorrow or Saturday.

I’ll be on-site Saturday to build 2x6 demising wall and set electrical panel
 
   / Doorman’s next big adventure
  • Thread Starter
#85  
Because @EddieWalker wants to know the weather today……

BEF1184A-B3FB-495B-A8E6-287264CB7565.png
 
   / Doorman’s next big adventure
  • Thread Starter
#86  
End of work day today

8837B6E7-E4E3-4991-9AEF-54529A6C6651.jpeg84E82382-0E54-4B17-9BBE-D24E25A9C449.jpeg1F3CDCF3-30A4-4D86-9E8C-18D574F6D30F.jpegB00F46C5-F817-47CB-827B-DD2222F15B09.jpeg0E8D90EB-0441-448E-B736-5E82955F6938.jpeg
 
   / Doorman’s next big adventure
  • Thread Starter
#87  
Demising wall and electrical work today.

51D2211B-8969-4A0F-AD1D-145F57516EFA.jpeg8A2D37D0-0FA6-43B7-ABDD-FC79996D17F6.jpegBB5CD533-3826-4817-89DB-7CD71AAB29C6.jpegEB8CEDA2-57D5-475F-A431-58B569A0B66E.jpeg
 
   / Doorman’s next big adventure
  • Thread Starter
#88  
Me and my buddy did some blocking on Sunday where a ledger will be for the loft
Ran some 2x4 nailers on top of the demising wall against the truss

Met with septic guy to spray paint the line for the pipe work

Neighbor and I agreed to $75 an hour for excavator work. Approx 3-6hrs total…….no delivery charge because he drives across the street!!!


Contractor was out today to do some more work.
More clay to bring up the grade for the covered front porch and they set some forms.




F5DB9206-5C62-4F54-A908-2F3F9489CCB8.jpeg0D120E25-1708-4108-BD9D-926A9BC1A8FA.jpegFE1C5835-62A4-4DFA-B483-D28B23035B9F.jpeg7AD3062D-A247-452A-B57D-35DDF88E6522.jpeg
 
   / Doorman’s next big adventure #90  
Looks nice, I cuss that style of door when I had to shovel out snow so they would open and close.
 

Tractor & Equipment Auctions

Butterfly Artwork (A55758)
Butterfly Artwork...
2024 JOHN DEERE CP 770 LOT NUMBER 21 (A53084)
2024 JOHN DEERE CP...
2019 CATERPILLAR 272D2 XHP SKID STEER (A52707)
2019 CATERPILLAR...
2012 Club Car Carryall 1 Utility Cart (A55851)
2012 Club Car...
2020 Massey Ferguson 1840 Small Square Baler - High-Performance Hay Baler (A55301)
2020 Massey...
2016 Ford Explorer AWD SUV (A55853)
2016 Ford Explorer...
 
Top