OP
Tags
Platinum Member
- Joined
- Feb 5, 2002
- Messages
- 720
- Location
- Connecticut
- Tractor
- BX2360/ Kubota SVL90-2/ Kobelco 115SR/ Takeuchi TB260
Delivery date....arrrrgh!
I know a couple of other people have bought 110's here and I'm wondering if you guys are getting the run-around on the delivery date.....I only ask because a little more than a week ago I was told that it would be shipped on april 25th,which would mean I would get it this week.....my salesman called me today and told me that Deere has pushed back the ship date and I <font color=red>should</font color=red> have the machine the week of the 13th of May,as much as I want the 110 if they push back the ship date again I may have to look for something else,possibly in <font color=orange>orange</font color=orange>.
I know a couple of other people have bought 110's here and I'm wondering if you guys are getting the run-around on the delivery date.....I only ask because a little more than a week ago I was told that it would be shipped on april 25th,which would mean I would get it this week.....my salesman called me today and told me that Deere has pushed back the ship date and I <font color=red>should</font color=red> have the machine the week of the 13th of May,as much as I want the 110 if they push back the ship date again I may have to look for something else,possibly in <font color=orange>orange</font color=orange>.