First Serious Project - Clearing 1.5 Acres

   / First Serious Project - Clearing 1.5 Acres
  • Thread Starter
#61  
More Trees Down.

MVC-060S.jpg
 

Attachments

  • 716781-MVC-060S.JPG
    716781-MVC-060S.JPG
    55.2 KB · Views: 114
   / First Serious Project - Clearing 1.5 Acres
  • Thread Starter
#62  
Two Trees at a time.

MVC-062S.jpg
 

Attachments

  • 716785-MVC-062S.JPG
    716785-MVC-062S.JPG
    51.5 KB · Views: 103
   / First Serious Project - Clearing 1.5 Acres
  • Thread Starter
#63  
View from Top Side.

MVC-064S.jpg
 

Attachments

  • 716786-MVC-064S.JPG
    716786-MVC-064S.JPG
    44.3 KB · Views: 106
   / First Serious Project - Clearing 1.5 Acres
  • Thread Starter
#64  
You can see that it is 509.1 feet deep here.

MVC-067S.jpg
 

Attachments

  • 716788-MVC-067S.JPG
    716788-MVC-067S.JPG
    47.1 KB · Views: 108
   / First Serious Project - Clearing 1.5 Acres
  • Thread Starter
#65  
More Trees Getting Cut Up.

MVC-069S.jpg
 

Attachments

  • 716790-MVC-069S.JPG
    716790-MVC-069S.JPG
    55.6 KB · Views: 105
   / First Serious Project - Clearing 1.5 Acres
  • Thread Starter
#66  
Carrying Two Logs to the Log pile.

MVC-070S.jpg
 

Attachments

  • 716791-MVC-070S.JPG
    716791-MVC-070S.JPG
    54 KB · Views: 108
   / First Serious Project - Clearing 1.5 Acres
  • Thread Starter
#67  
Land Beginning to Open Up to Mr. Sunshine /forums/images/graemlins/wink.gif

MVC-071S.jpg
 

Attachments

  • 716793-MVC-071S.JPG
    716793-MVC-071S.JPG
    56.6 KB · Views: 107
   / First Serious Project - Clearing 1.5 Acres
  • Thread Starter
#68  
I will post more pictures of todays work tomorrow. Another storm moving in so I will have to shut my computer system down. This will be the last picture tonight. It is opening up nicely.

Have a Great Day.

MVC-087S.jpg
 

Attachments

  • 716797-MVC-087S.JPG
    716797-MVC-087S.JPG
    56.4 KB · Views: 103
   / First Serious Project - Clearing 1.5 Acres
  • Thread Starter
#69  
We started at the back because the brush and stumps are being taken to the back where it drops off before getting to the creek.
MVC-091S.jpg
 

Attachments

  • 717134-MVC-091S.JPG
    717134-MVC-091S.JPG
    46.4 KB · Views: 120
   / First Serious Project - Clearing 1.5 Acres
  • Thread Starter
#70  
Another pile of wood started.

MVC-093S.jpg
 

Attachments

  • 717136-MVC-093S.JPG
    717136-MVC-093S.JPG
    48.8 KB · Views: 102

Tractor & Equipment Auctions

2018 Ram 5500 Bucket Truck 4x4 with Versalift VST40 - 45FT Rotating Bucket and Jib Winch (A51039)
2018 Ram 5500...
2007 Freightliner Columbia 120 - Class 8, 6x4, Mercedes MBE4000 Diesel (A51039)
2007 Freightliner...
Unused 2025 CFG H15R Mini Excavator (A49461)
Unused 2025 CFG...
2013 TIGER CAT 720E WHEEL FELLER BUNCHER (A51242)
2013 TIGER CAT...
2003 Big Tex 10PI 16ft. T/A Pipe Top Utility Trailer (A49461)
2003 Big Tex 10PI...
2017 Chevrolet Silverado 1500 Crew Cab Pickup Truck (A50323)
2017 Chevrolet...
 
Top