Good morning!
God has given us another chance to get it right (or at least not screw up too badly).
38F, going to maybe 80.
been busy —
good busy. Painted the two deep hive boxes with some “No Trespassing“ paint (in NC you can paint a 12” band of purple around a tree and it is - by statute- a “No Trespassing/Posted” sign. Added some decoration to make it easier for bees to know which is which ( and make Mrs happy, since she wanted them decorated…
):
Took off the chains and plow. Yeah, blame me for any snow this week.
Made a mock-up of a spare tire carrier for the UTV:
Now to draw a diagram and go to the metal supply and have them fab it.
We had our two phone interviews with dog training boot camp. First one was in morning with Corporate. We had the lady rolling with some of the antics of Harry, especially when we got to the part about “Food Allergies” and I said “He eats sticks, rocks, and chicken poop. I think he is OK on that one”. Second interview was with trainer, which went well, she as two working dogs, one cadaver dog and one SAR dog, has been working with her county Sheriff’s office for several years. Highly amused by Harry’s favorite toy ( a rock in a sock we used as a doorstop). He goes for three weeks starting May 7th.
put the last two elderberries in at the woodlot, and repotted the four that I am keeping at the house.
also assembled another ten hive frames and used the last of my wired beeswax foundation sheets. I did not get to inspect the hives yesterday as it was too windy, hope to do that today, and see if it is time to add that second story to the hives.
Today, we are taking the UTV (christened “TUK TUK” after the Asian scooter cabs) for inspection so we can renew the registration (in NC you can legally operate on the paved roads if you pr unit has required equipment and passes MV inspection) before the end of the month. I do need to check the air pressure before heading out.
Our hot tub (9 years old) has developed a small leak, I need to find it. You all know it will be in the least accessible point from the main access panel…
free Concert tonight at the Performing Arts Center by the NC State Symphony Orchestra.
Still waiting to hear back from contractors about grading/graveling.
I hope everyone has a happy healthy safe productive blessed Hump Day!