gravel path=giant mess

   / gravel path=giant mess
  • Thread Starter
#11  
I suppose that depends on the size fires you like to have in your fire pit now doesnt it :D[/QUOTE

Could get out of hand REAL fast.

I hadn't considered a gazebo/firepit combo
I like it!
 
   / gravel path=giant mess #12  
Here is a drawing of a gazebo fire-pit.
 

Attachments

  • gazebo firepit.jpg
    gazebo firepit.jpg
    5.3 KB · Views: 311
   / gravel path=giant mess #13  
Looks like quite a project. Believe me, that is not that bad, here in Oregon the ground is just sloppy mud right now. i need a whole week of dry weather before I do any excavation. :eek:
 
   / gravel path=giant mess #14  
Looks like quite a project. Believe me, that is not that bad, here in Oregon the ground is just sloppy mud right now. i need a whole week of dry weather before I do any excavation. :eek:

Agree, The ground looks soaked. No drinking and driving a tractor. Bad things happen.Let ground dry ouy and box blade flat again.
 
   / gravel path=giant mess #15  
Your dog is laughing at you. I bet the wife is impressed as well. Good luck, you need some.
 
   / gravel path=giant mess
  • Thread Starter
#16  
Looks like quite a project. Believe me, that is not that bad, here in Oregon the ground is just sloppy mud right now. i need a whole week of dry weather before I do any excavation. :eek:

About a quarter of our backyard was off limits last spring bc of rain and its the low spot.
I installed a french drain, 80 feet long and started 2 feet deep.
All by hand, pick and shovel the whole way.

I bet a box scraper would have made this path much easier.
Get a 6 footer and scrape away an inch each pass, repeat till clear.
 
Last edited:
   / gravel path=giant mess
  • Thread Starter
#18  
The ground is actually quite dry right now.
A tooth bar would be a helpful attachment.
Carrying those ties over has been a workload.
 
   / gravel path=giant mess #19  
When I made a gravel path, I dug out about 3' wide path, from the side with the front end loader. Just dug out about 3-4" or so deep . Then put in weed barrier, then dumped asphalt millings on top. made a nice gravel walk, was quick to build, and very little mess.
 
   / gravel path=giant mess
  • Thread Starter
#20  
I considered weed barrier but decided against it.
I will give it a healthy blast of weed killer twice a year.

I wanted to have all the ties in by end of day, I fell 3 short.
Will have them in tomorrow.
Hopefully level all ties by tomorrow as well.
Fill path starting Tuesday.
 

Tractor & Equipment Auctions

2016 Case 821F Articulated Wheel Loader (A51691)
2016 Case 821F...
UNUSED SDLANCH HYD MINI THUMB CLAP7P (A57193)
UNUSED SDLANCH HYD...
2020 John Deere 8245R MFWD Tractor (A53485)
2020 John Deere...
2018 International Durastar 4300 Altec LR756 56ft. Insulated Forestry Chipper Bucket Truck (A55852)
2018 International...
2018 John Deere 350G LC Hydraulic Excavator (A55851)
2018 John Deere...
4 Unused Montreal ST205/75R15 Trailer Tires (A55788)
4 Unused Montreal...
 
Top