gravel path=giant mess

   / gravel path=giant mess
  • Thread Starter
#11  
I suppose that depends on the size fires you like to have in your fire pit now doesnt it :D[/QUOTE

Could get out of hand REAL fast.

I hadn't considered a gazebo/firepit combo
I like it!
 
   / gravel path=giant mess #12  
Here is a drawing of a gazebo fire-pit.
 

Attachments

  • gazebo firepit.jpg
    gazebo firepit.jpg
    5.3 KB · Views: 311
   / gravel path=giant mess #13  
Looks like quite a project. Believe me, that is not that bad, here in Oregon the ground is just sloppy mud right now. i need a whole week of dry weather before I do any excavation. :eek:
 
   / gravel path=giant mess #14  
Looks like quite a project. Believe me, that is not that bad, here in Oregon the ground is just sloppy mud right now. i need a whole week of dry weather before I do any excavation. :eek:

Agree, The ground looks soaked. No drinking and driving a tractor. Bad things happen.Let ground dry ouy and box blade flat again.
 
   / gravel path=giant mess #15  
Your dog is laughing at you. I bet the wife is impressed as well. Good luck, you need some.
 
   / gravel path=giant mess
  • Thread Starter
#16  
Looks like quite a project. Believe me, that is not that bad, here in Oregon the ground is just sloppy mud right now. i need a whole week of dry weather before I do any excavation. :eek:

About a quarter of our backyard was off limits last spring bc of rain and its the low spot.
I installed a french drain, 80 feet long and started 2 feet deep.
All by hand, pick and shovel the whole way.

I bet a box scraper would have made this path much easier.
Get a 6 footer and scrape away an inch each pass, repeat till clear.
 
Last edited:
   / gravel path=giant mess
  • Thread Starter
#18  
The ground is actually quite dry right now.
A tooth bar would be a helpful attachment.
Carrying those ties over has been a workload.
 
   / gravel path=giant mess #19  
When I made a gravel path, I dug out about 3' wide path, from the side with the front end loader. Just dug out about 3-4" or so deep . Then put in weed barrier, then dumped asphalt millings on top. made a nice gravel walk, was quick to build, and very little mess.
 
   / gravel path=giant mess
  • Thread Starter
#20  
I considered weed barrier but decided against it.
I will give it a healthy blast of weed killer twice a year.

I wanted to have all the ties in by end of day, I fell 3 short.
Will have them in tomorrow.
Hopefully level all ties by tomorrow as well.
Fill path starting Tuesday.
 

Tractor & Equipment Auctions

John Deere 5055E (A53317)
John Deere 5055E...
2008 GMC C5 (A53422)
2008 GMC C5 (A53422)
HOBBS 48FT FLOAT (A55745)
HOBBS 48FT FLOAT...
UNUSED JCT HYD AUGER (A57193)
UNUSED JCT HYD...
UNUSED FUTURE SE61-61" HYD SWEEPER (A57193)
UNUSED FUTURE...
2013 Dodge Durango Crew AWD SUV (A55853)
2013 Dodge Durango...
 
Top