How to cut a concrete basement floor?

   / How to cut a concrete basement floor?
  • Thread Starter
#21  
Here's a few bad pictures of the basement project. I'm working on getting the ceiling done. Part of the ceiling is drywall and part is drop. I also still have to put in a nice set of stairs.

Jeff
 

Attachments

  • 786090-basement_2004_2.jpg
    786090-basement_2004_2.jpg
    90.6 KB · Views: 1,775
   / How to cut a concrete basement floor?
  • Thread Starter
#22  
another
 

Attachments

  • 786092-basement_2004_3.jpg
    786092-basement_2004_3.jpg
    95.1 KB · Views: 1,340
   / How to cut a concrete basement floor?
  • Thread Starter
#23  
and another
 

Attachments

  • 786093-basement_2004_4.jpg
    786093-basement_2004_4.jpg
    88.5 KB · Views: 961
   / How to cut a concrete basement floor?
  • Thread Starter
#24  
...
 

Attachments

  • 786095-basement_2004_5.jpg
    786095-basement_2004_5.jpg
    83.9 KB · Views: 869
   / How to cut a concrete basement floor?
  • Thread Starter
#25  
These are recent
 

Attachments

  • 786096-DSC00057.JPG
    786096-DSC00057.JPG
    74.6 KB · Views: 958
   / How to cut a concrete basement floor?
  • Thread Starter
#26  
....
 

Attachments

  • 786097-DSC00058.JPG
    786097-DSC00058.JPG
    76.1 KB · Views: 694
   / How to cut a concrete basement floor?
  • Thread Starter
#27  
.....
 

Attachments

  • 786098-DSC00059.JPG
    786098-DSC00059.JPG
    88.6 KB · Views: 649
   / How to cut a concrete basement floor?
  • Thread Starter
#28  
Last one......the stariway hall.
 

Attachments

  • 786099-basement_2004.jpg
    786099-basement_2004.jpg
    85.6 KB · Views: 836
   / How to cut a concrete basement floor? #29  
So are you also using a sewage pump to get the waste up to the first floor level?
 
   / How to cut a concrete basement floor?
  • Thread Starter
#30  
Yep, that's the only option I had short of putting in a septic for that one bathroom.

Got the concrete in today.....not as bad a job as I thought it would be. It took 20 60lbs bags of concrete. Tomorrow I'm off to purchase the shower stall and the shower valve. Then I'll frame in the closet where the sewage pump goes, plumb the supply lines with pex, insulate then drywall.........it just never seems to end!!!!

The ceiling tiles in the pictures are not done because the nimrod that estimated how many tiles to order (which would be me) didn't get enough and it takes Amrstrong over a month for special orders.

Jeff
 

Attachments

  • 786345-Bathroom Plumbing 008.JPG
    786345-Bathroom Plumbing 008.JPG
    92.2 KB · Views: 2,128

Tractor & Equipment Auctions

2015 JOHN DEERE 35G EXCAVATOR (A52707)
2015 JOHN DEERE...
UNUSED FUTURE FT20 EXCAVATOR (A52706)
UNUSED FUTURE FT20...
Electric Diesel Fuel Pump with Hose Reel (A55851)
Electric Diesel...
2021 Allmand Bros Maxi-Lite II 20kW S/A Towable Light Tower (A55973)
2021 Allmand Bros...
2008 Ford F-250 Lariat 4X4 - 303,424 miles - 6.4L Powerstroke -Automatic (A56435)
2008 Ford F-250...
2017 Makita HM1307CB 35lb Demolition Hammer (A55973)
2017 Makita...
 
Top