Hydraulic Top Link Recommendations Wanted

   / Hydraulic Top Link Recommendations Wanted #21  
Yeah I feel you. I had to wait about 9 months when I had ordered mine.
I waited 9 months for my kids. Not sure about waiting that long for a hydraulic top link šŸ˜†
 
   / Hydraulic Top Link Recommendations Wanted #22  
Yeah I feel you. I had to wait about 9 months when I had ordered mine. But it was worth it. I do a lot of grading and it comes in very handy with my vegetable farming implements. Very smooth control with the restrictors and the cylinder ends were a dead match to the factory.

I am in need of another for a more recent tractor I acquired. A lot of people did opt for fast local routes.
Well, I'm down to 10 weeks currently. ;)
 
   / Hydraulic Top Link Recommendations Wanted #24  
I want your business ā€œproblemsā€ lol
Mud2money waited 9 months during covid. I had over 260 orders at the time. Every order gets built in the order that they are placed.
He wanted a side link as well as a top link. There are not a lot of choices for an off-the-shelf product when you need a unit that does not warrant a mass-produced unit.
 
   / Hydraulic Top Link Recommendations Wanted #25  
Mud2money waited 9 months during covid. I had over 260 orders at the time. Every order gets built in the order that they are placed.
He wanted a side link as well as a top link. There are not a lot of choices for an off-the-shelf product when you need a unit that does not warrant a mass-produced unit.
The overwhelming endorsement here and your backlog says a lot about you and your business
 
   / Hydraulic Top Link Recommendations Wanted #27  
Ha that would be nice ! Covid was a real time waster. Glad to see lead times came down a ton.
Not so good for me, shorter lead times indicate fewer customers. Covid was nuts in how people spent money. Covid never really affected my lead times as in material delays. My delays were 100% related to how many orders I had, nothing to do with the materials to build the end product. I know that suppliers have had their issues, but as far as my suppliers, I had no supply issues. My delays are because being a one-man operation, I can only build this stuff so fast.
There are only so many hours in a day. ;)
 
   / Hydraulic Top Link Recommendations Wanted #28  
Not so good for me, shorter lead times indicate fewer customers. Covid was nuts in how people spent money. Covid never really affected my lead times as in material delays. My delays were 100% related to how many orders I had, nothing to do with the materials to build the end product.
Wow that’s lucky. I’m still dealing with supply issues and long lead times for parts. It’s been frustrating. Just had to wait 2 weeks for a tiny little stamped plate from NH. Delayed a few jobs. I will message you about a cylinder.
 

Tractor & Equipment Auctions

2025 New/Unused Wolverine Auger Drive and Bit (A51573)
2025 New/Unused...
2015 Peterbilt 320 T/A EZ-Pack Front Loader Garbage Truck (A51692)
2015 Peterbilt 320...
2014 Dodge Charger Sedan (A52377)
2014 Dodge Charger...
2014 Dodge Ram 5500 Chevron Wrecker Tow Truck (A51692)
2014 Dodge Ram...
2007 Hino 268 Truck, VIN # 5PVNJ8JT072S50704 (A51572)
2007 Hino 268...
2019 Allmand Night-Lite V-Series S/A Towable Light Tower (A52377)
2019 Allmand...
 
Top