Aquamoose
Platinum Member
The angle bracing in your second drawing, under the deck, is unnecessary. The bridge cannot fall toward either end because it will be pushing against land.
I believe the cross bracing is for restricting lateral movement (side-to-side). It’s a good idea to have that in place.