I get to do this very soon to. :/ My slab is collecting mud. my problem is the driveway is about 6" above the house's grade. i have about 100 ' worth of trenching to do right near the edge of the driveway I also get to dodge the telephone line
the worst part of it is the place as 0 gutter and lots of snow in the winter. when it melts its gona get ugly for me :/