husband_dad_engineer
New member
Thanks for the input. With those risks, I like the idea of getting it out 100' instead of just the minimum.
My question is, I've got the choice where the transformer will be, just a minimum of 15' and maximum of 200' from the structures. Where should I put it? Should I stick it between the house and barn to minimize the secondary run or put it 100' or so away from everything?
I'll be doing this same project in a few weeks, going 2000' from the road to a pad mount transformer for a new house and barn. I dig the 48" deep trench and the rural electric company takes care of everything else (conduit, junctions boxes, etc.). Luckily, I'll mostly be going through top soil (northeast OK).
It'll run from the pole at the county road, along the north side of the driveway easement, but then what? I'll also be running water along the same length, with 1' horizontal and vertical separation requirements. I'll put the electric trench closest to the driveway and the water line trench just north of that.
My question is, I've got the choice where the transformer will be, just a minimum of 15' and maximum of 200' from the structures. Where should I put it? Should I stick it between the house and barn to minimize the secondary run or put it 100' or so away from everything?