Making one attatchment do 2 jobs- Hay Spike

   / Making one attatchment do 2 jobs- Hay Spike #1  

KennethBrown

Silver Member
Joined
Aug 9, 2004
Messages
228
Location
Central Texas-Freestone/Donie
Tractor
Mahindra 5500
A few years back I built a 3 pt hay spike. It works wonders for moving the round bales in the field. The downside is I can off load the first bale on a trailer but the rest I have to roll off. I was going to build me a spike for the FEL and started looking at my 3 pt mover. Humm...... I slid it into the bucket and the top link hookup went right around the welded on hook. I added a couple of pieces of angle iron to the bottom with holes burned through them and the bucket (along with 5/8" bolts) and its done. I use a 1/2 bolt through the top hook to hold it in place up there. I haven't gotten to lift any bales with it yet but it seems pretty sturdy. One less thing to move around and keep up with and now I can do so much more. Looks like I'll be putting 5 bales on the trailers instead of 3.
 
   / Making one attatchment do 2 jobs- Hay Spike #2  
Hooray.... your hay moving efficiency has greatly increased...good work!

I took my FEL hay spike and made a boom from pipe that extends further in front... for reaching into tight spaces and picking up something heavy.
 
   / Making one attatchment do 2 jobs- Hay Spike #3  
I did the same thing with a 10' piece of 2 1/2" Steel pipe. It slips over the bale spear and is tall enough so we set trusses on our 24x86 equipment shed. My Father actually came up with the idea.
 
 

Tractor & Equipment Auctions

1996 Dorsey Enclosed Trailer, VIN # 1DTV11520TA252324 (A57453)
1996 Dorsey...
DEUTZ MARATHON 60KW GENERATOR (A55745)
DEUTZ MARATHON...
(INOP) 2016 CATERPILLAR 259D SKID STEER (A52707)
(INOP) 2016...
PumpJack Brand Pump Jack (A56436)
PumpJack Brand...
TUGGER TRAILER (A55745)
TUGGER TRAILER...
48ft all aluminum feather light wedge trailer (A56436)
48ft all aluminum...
 
Top