I want to be able to keep the middle of a 400' long ditch scraped out. I also want to cut a 75' trench through my yard for burying a run of pex pipe to supply water to my shop. I'm thinking 12" under ground will be sufficient for the water pipe. I'm thinking I can also drag up the roots from a couple of bushes that I want to remove from my yard as well. Should I go with a sub soiler considering that it would work best for most of my planned work? Problem is that the sub soiler jobs are going to be one time jobs. Would a sub soiler work for keeping the ditch draining properly too, or would a middle buster be ideal for that? Does anyone make a sub soiler that can have a middle buster plow put on it for the ditch scraping?
I do not garden and do not need to level or smooth out any areas.
Ground work will be done in SE Texas on san augustine grass with no rocks and mostly no roots. Clay can be found about a foot down though.
I do not garden and do not need to level or smooth out any areas.
Ground work will be done in SE Texas on san augustine grass with no rocks and mostly no roots. Clay can be found about a foot down though.