bindian
Super Member
The Lull has been in a heavy equipment repair shop for about a month. Two weeks to wait for space, one week to get trunion bearings and steering rod end for the left front axle and one week to R&R the two hydraulic lines in the boom. The boom is removed for this. They were maypop lines. One week to get all hyd. filters and fluid replaced. I should get her back next week.
hugs, Brandi
hugs, Brandi