My work shop build in progress

   / My work shop build in progress
  • Thread Starter
#191  
Its been a couple months now since I remembered to post here so some update should be in order.
I have been working on getting the North wall closed in and insulated as I went so now have it closed to the bus and to the 8 ft high level the rest of the way to the stairway which will also encompass a shop restroom that I can make ADA compliant for future should the need arise.
Starting with the stairway
WP_20200815_18_48_38_Proft.jpg
Next I began installing some lighting in the shop so far I only have 4 100 watt LED lights installed
WP_20200907_20_51_38_Prolgt.jpg
the switches with room for more
WP_20200907_20_55_01_Prolgt.jpg
next the North wall
20200923_104724ns.jpg
For the roof over the stairway I used my remaining standing seam panels
20200924_181055nw.jpg
the start of the East wall
WP_20200914_15_32_17_Richew.jpg
 
   / My work shop build in progress #192  
I like your ingenuity and repurposing of materials !! Keep up the great work....
 
   / My work shop build in progress #193  
Thanks for the update. Lookin gooder-un. blue TU.gif.
 
   / My work shop build in progress #194  
Good to hear from you Frank!!! Thank you for the pics.

Is that a bit scary on that extension ladder installing lights??? :)
 
   / My work shop build in progress
  • Thread Starter
#195  
Had a really good day yesterday and today
the roof is joined with the Affiliated machine shop van.
I had another 8ft by 25 ft gate that was begging to be used on the shop
and the very last remnants of any standing seam panels that I had left were welded together and used as a gutter. Now I think I may have about 2 feet left to use on something
20200928_112930sw.jpg
After finishing with the South side we moved back to the North side
Now all that remains of closing in the stairway is the west side
20200928_182411ENW.jpg
Having 1 helper these past few days has been a huge plus
20200928_183620br.jpg
Luckily I had enough 16 ft sheets of metal to do the sides
 
   / My work shop build in progress
  • Thread Starter
#196  
finished the end cap on the west side today now only about 20 to 25 feet of wall to put up on the west and the 48ft wide curtain roll up door
20200929_130053ww.jpg
 
   / My work shop build in progress
  • Thread Starter
#197  
Good to hear from you Frank!!! Thank you for the pics.

Is that a bit scary on that extension ladder installing lights??? :)

As much as I hate working from any ladder it was about the only way to do what needed doing at the time
 
   / My work shop build in progress #198  
Good to hear from you Frank!!! Thank you for the pics.

Is that a bit scary on that extension ladder installing lights??? :)

As much as I hate working from any ladder it was about the only way to do what needed doing at the time
Not tall enough for your shop, but the added 6' ladder worked in mine to reach the lights:

PC220040.JPG
PC160006.JPG
PC080011.JPG
 
   / My work shop build in progress #199  
What a project Frank!!!! I've really enjoyed following along!!!!

We've got another six weeks of good weather for outdoor projects up here. Then the good days will be out numbered by the bad days for 120 days.....
 
 