txdon
Super Star Member
A cool 92 degrees in Texas and a nice day to pour our first beam. This is the most concrete that I have attempted to pour at one time ever, using 80 pound bags. The pour took one and a half hours, 19 bags and five mixers full of concrete. The beam is 8" at top and 10" at bottom and 10" thick.
This is our setup.
(Oh, when I say "our" or "we" it means wife and I. /forums/images/graemlins/smirk.gif)
This is our setup.
(Oh, when I say "our" or "we" it means wife and I. /forums/images/graemlins/smirk.gif)