I rented a genie lift, crank it up about 6 feet and place it on by hand, then crank. They went up no problem. We did 20 arches in 2 days, the longest time is getting each arch bolted to the last one. We had all the arches pre-assembled on the ground ahead of time, and we had the edge stuff to bolt each one onto.