OP
rcrcomputing
Platinum Member
Re: pole barn make use of cut tree\'s
Did I fail to mention the rock would be about 2' by 2' by 4'?
Ok, I ment a boulder. /forums/images/graemlins/smile.gif That, in the ground, under the posts would certainly hold. A contractor I talked to said to set the post then drill through both and drive the spike into the rock.
Did I fail to mention the rock would be about 2' by 2' by 4'?
Ok, I ment a boulder. /forums/images/graemlins/smile.gif That, in the ground, under the posts would certainly hold. A contractor I talked to said to set the post then drill through both and drive the spike into the rock.