Bebster,
I'm thinking of putting in 12 inch diameters with a footer that is at least 28" square and 12 inches thick.
Why?
Well, 12 inches gives me some play to make sure the piers are
all inline and square.
I read somewhere that the footer should have 8" on each side
of the pier. I think that is overkill but what the heck.
The frost line in my area is supposed to be 6 inches.
I'm planning on digging about 24-32 inches deep. The pier
tubes are 4 feet so I'll cut them in half to get 2 feet. I want at
least 8 inches of the pier above grade. So I should be digging
a 28 inch deep hole.
Per an earlier TBN conversation I'm going to backfill with ABC.
I'll talk to the building inspector to see what he says. I'm still
waiting on info from the truss company. If I did my math
correctly, a big if sometimes, the loads really are not that bad
for the roof. Eventually one side of the barn will be a shop
that will be guilt on beams attached to the posts. That
requirement has made the loads a bit interesting on that side
of the barn...
Later,
Dan