Road building with a Dozer track Drag behind the skidder!

   / Road building with a Dozer track Drag behind the skidder! #11  
From what I gathered he intends to snowmobile on the trail. I don't know why he wouldn't just use the front blade though.

I think the ability of the dozer track to adjust to the slope of the land is the advantage. Those fixed blades are not all that great for that kind of work.
 
   / Road building with a Dozer track Drag behind the skidder! #12  
That would be okay for a atv or snowmobile. For a pickup friendly road, you need to push out the loam with a bulldozer, often down 2 feet, then fill in with tailings or riprap, and go down in rock size as you get to the surface, ending with gravel or dense grade.
 

Tractor & Equipment Auctions

2017 Dodge Charger Sedan (A59231)
2017 Dodge Charger...
V.E. ENTERPRISES 500 BBL FRAC TANK (A58214)
V.E. ENTERPRISES...
2007 Heil Heavy Duty Aluminum Tank Trailer (A56438)
2007 Heil Heavy...
Toro Sand Pro (A56859)
Toro Sand Pro (A56859)
TANK MANIFOLD (A55745)
TANK MANIFOLD (A55745)
2006 iDrive TDS-2010H ProJack M2 Electric Trailer Dolly (A59228)
2006 iDrive...
 
Top