I am not aware of any NEC section that would prevent you from making your own "knockout" in the rear of the meter base. But, I can't remember the last time I saw one that didn't have one in it already. Just plan your install so that the meter base and the load center are back to back with the supplied knockouts back to back and use a nipple between them. BTW, I'm not sure which code you're required to follow, but, the 2008 NEC requires the intersystem bonding connect. You can just use a 4 space min. lug machine screwed to the bottom meter base.
So I basically am attaching my grounding wire to this. I plan on running one continous wire from the grouunding rods threw the intersystem bonding connect and right to the breaker box. Should that be ok?
I also am now planning on attaching the meter and breaker box togther so i can punch out the back. Its a metal pole barn so I am sure they sell some rubber gasket that i can use around the metal edges so that I run the wires threw without the risk of nicking the wires?
Last edited: