Second project( tooth bar)

/ Second project( tooth bar)
  • Thread Starter
#12  
The tooth bar is bolted in on the sides, I'll try to give you a link to Fabco, I hope it works! [url=http://www.fabco-inc.com
 
/ Second project( tooth bar) #13  
Thanks for the link Jim and Jan Now that the hooks are on the bucket teeth will be the next project...or was that after the weight box??? /forums/images/graemlins/wink.gif

Lou
 

Marketplace Items

2015 MACK GU713 DUMP TRUCK (A59823)
2015 MACK GU713...
2012 HEIL TRAILER INTERNATIONAL CRUDE TRAILER (A60736)
2012 HEIL TRAILER...
2025 AGT STSD10 72" Grain Drill (A60463)
2025 AGT STSD10...
2021 JOHN DEERE 331G SKID STEER (A62129)
2021 JOHN DEERE...
2022 FORD F-250 STX CREW CAB TRUCK (A59823)
2022 FORD F-250...
2013 Audi A4 Sedan (A55853)
2013 Audi A4 Sedan...
 
Top