It is rather common in high end homes and in communities where the codes are a bit harder. Screwed and Glued that is. Still nail off perimeter of board but screw double sets on each stud with glue on each stud on all walls. Hung for a good number of years & both older brothers ran their own companies (I worked with them on & off when they needed extra hand.)
Cost of glue is not too bad 20~25/case & is only about 1~2 cases per average 3k foot home, maybe 2.5 for a bigger home or one with 9+ walls. PL glue which stays pliable for a LONG time & normally hand ceilings and then glue only walls finish off one or two rooms then screw them all off.
There are lots of local codes that all want something different, one inspector wanted the screws 2.5~3 inches apart with 16~18" between pairs. Guy would take 2 hours in a house measuring these distances and if he found more than 10 he would fail the home & require individual marks on ALL screws... :/ He didn't last too long for the town (very high end homes Million plus finished cost.)
m
Cost of glue is not too bad 20~25/case & is only about 1~2 cases per average 3k foot home, maybe 2.5 for a bigger home or one with 9+ walls. PL glue which stays pliable for a LONG time & normally hand ceilings and then glue only walls finish off one or two rooms then screw them all off.
There are lots of local codes that all want something different, one inspector wanted the screws 2.5~3 inches apart with 16~18" between pairs. Guy would take 2 hours in a house measuring these distances and if he found more than 10 he would fail the home & require individual marks on ALL screws... :/ He didn't last too long for the town (very high end homes Million plus finished cost.)