The Log house Project begins........

   / The Log house Project begins........
  • Thread Starter
#303  
And then the rains came..............but it does bring out the color of the cedar:

IMG_4448.jpg


IMG_4446.jpg


IMG_4451.jpg
 
   / The Log house Project begins........
  • Thread Starter
#304  
IMG_4447.jpg


IMG_4449.jpg


We went up to check on the floor. So far it is handling the water ok, but I am a little worried about what it will do when it drys back out. We are going to get over 48hrs of straight rain from this tropical depression.
I hope to get the walls completly done by the end of this week.
 
   / The Log house Project begins........ #305  
Have you thought about using a urethane to make the beautiful colors last?
 
   / The Log house Project begins........
  • Thread Starter
#306  
Have you thought about using a urethane to make the beautiful colors last?

Yep, but that will be after the entire interior walls get sanded with 40/60 grit. The outside will get pressure washed, then coated with a UV resistant sealer.
 
   / The Log house Project begins........ #307  
We used a squeegee to get the water off our sub floors when it rained during our construction and we even bored a few holes in the sub floors for drains...We kept up with it ...over and over until the rains stopped...Sure glad we did too...We used 3/4 inch T&G Advantac...good luck !
 
   / The Log house Project begins........ #308  
Can you tarp it? They make some pretty big ones....I've seen em at HF. I hate water on open wood, always tried to avoid it if at all possible.
 
   / The Log house Project begins........
  • Thread Starter
#310  
Brin, it's been raining for 24hrs straight and not supposed to let up until tomorrow...a squeegee would not help much. This is 3/4" T&G Advantage, water resistant, w/lifetime warranty. My neighbor is a builder and said that he has had an open floor to weather for up to 4 months with no real ill effect.....man I hope he is right.
Scout I'm with you, but my big tarp went south covering hay last year. If I can get thru this I hope to get the rafters up within two weeks.
 

Tractor & Equipment Auctions

Giyi 59" Log Splitter (A53316)
Giyi 59" Log...
2018 JLG 2632ES 26ft Electric Scissor Lift (A55787)
2018 JLG 2632ES...
Hitch-Hiker 3600 Sod Forklift (A53314)
Hitch-Hiker 3600...
40' CONTAINER (A51244)
40' CONTAINER (A51244)
2007 Ford F-350 4x4 Flatbed Truck, VIN # 1FDWF37P27EA64904 (A54865)
2007 Ford F-350...
Ford Super Duty Pickup Truck Bed (A51691)
Ford Super Duty...
 
Top