Timber Frame Build - Round 2

   / Timber Frame Build - Round 2
  • Thread Starter
#241  
Wow, you've been busy.

I asked about the location of the house because I've thought about a reception hall on our place. Our town could use one. But our house is here and I'm with you about having work a bit aways.

A young friend of mine just married last year. He and his wife chose a place, based on some architect's plans and not much else was even started being built. They got it for Friday, Saturday, and out by 10 am Sunday with both the wedding and reception there for a sum of $5000 (early deposit, pre-build price). His father told me on the day of the wedding, that it was now going for around $13,000.

Peach Creek Ranch

I see they offer a Sun 10am to Mon 10am package still for $5K. Seems more couples are getting married on Sundays now.

My Saturdays filled first. Now that they are full we are booking a few Sunday's. I have a couple months that all booked. The rest have 1 to 2 Sunday weddings per month. We are offering a weekend package for our 2019 bookings Friday thru Sunday as an option.
 
   / Timber Frame Build - Round 2
  • Thread Starter
#242  
I finished decking the outside porches today. My contractor should be here Wed to install the metal roofing. As soon as we get the metal on we can get our exterior doors installed as well. Sheetrock is also finished. We picked up paint today. Tomorrow I will move back inside to finish the inside ceilings. I am hoping by next weekend to be finished installing t&g ceilings inside, have paint done, and be ready for lighting fixtures and trim. As soon as I get all of this wood out of the building I'll have some room to get started building the bar as well.


Video link
20180210_152448

Pics
2018-02-10_05-44-40

2018-02-10_05-45-26
 
   / Timber Frame Build - Round 2 #243  
Man that is nice, the video shows more than the pics do sometimes.
 
   / Timber Frame Build - Round 2
  • Thread Starter
#245  
looking great! Are you doing all the work? If so, Wow!

I've done all of the t&g install myself. Subbing out the metal install. My wife and kids have been helping poly it all. Moving back inside to work on ceilings now. Only about 40% done inside.
 
   / Timber Frame Build - Round 2
  • Thread Starter
#247  
Hopefully it's a bit warmer inside. :)

It is. Had one nice day outside then 20's for the rest. Got the temp at 50 inside which is a nice working temp.
 
   / Timber Frame Build - Round 2
  • Thread Starter
#249  
Dropped by tonight to check on the tile work for the house/bridal suite upstairs. Looks like tile is just about wrapped up. We tore out all of the old linoleum floors and replaced with tile. The fiberglass shower insert in the master bath was also removed for a tile shower as well as new tile around the bathtub.

Before pic of the bathtub

2018-02-11_10-37-34

After pic of the finished tile work along with the tiled shower

2018-02-11_10-38-25

2018-02-11_10-38-43
 
   / Timber Frame Build - Round 2 #250  
Very tasteful tile choice!:thumbsup:
 

Tractor & Equipment Auctions

Deere 9970 Cotton Picker (A52128)
Deere 9970 Cotton...
2012 Ford F-150 Pickup Truck (A50323)
2012 Ford F-150...
(INOP) CATERPILLAR 416B BACKHOE (A50459)
(INOP) CATERPILLAR...
2018 FREIGHTLINER CASCADIA TANDEM AXLE SLEEPER (A51222)
2018 FREIGHTLINER...
Kubota F3990 (A50322)
Kubota F3990 (A50322)
2012 UTILITY VS2DX 53FT DRY VAN TRAILER (A52141)
2012 UTILITY VS2DX...
 
Top