Two Long Hard Days
Now that the brick is finished, we need to backfill the footers so that water doesn't collect on them. So we started that job Saturday. Around 8 AM Saturday it rained long enough to make everything muddy and not fun to work in when you are doing digging work.
Since we don't have much depth between the framing and the footers around the basement foundation walls, I worked on cleaning all the junk left on the footers by the brick workers, mortar, bricks, sand, etc. Cleaning the footers was hard labor; my back is very tired. At about 7 PM we got caught by a heavy rain shower and we got drenched. I worked through the rain and stopped working close to dark.
My wife worked on gluing together the drain pipes shown at the end of the retaining wall. It was very tricky getting all the pipes put together and glued just right. My wife glued the contraption together the first time with the cleanout-T put on backwards. She was very frustrated at that point. However, I did that once a few months ago myself. She had to throw away her work and start over. After a lot of measuring and cutting, she got it right.
Today I worked again on cleaning the footers and backfilling. Tomorrow I get to go to my regular job and get some rest. However, this week after work I will be doing more the same stuff I did this weekend.