New Driveway- 2 pavement options..help!!

   / New Driveway- 2 pavement options..help!! #11  
that single lift black base is likely cheaper due to less hands on labor.. besides.. it's the method I'd choose in your situation nayway. the fact that it is cheaper is just a bonus.

soundguy
 
   / New Driveway- 2 pavement options..help!! #12  
When I had my driveway done, it was about 6k, and around 6000 sq. ft. This was about 10 years ago before prices took off. I'm guessing the same thing done today would be about 10k.
 
   / New Driveway- 2 pavement options..help!! #13  
unless you were in the southeast.

we are doing work with material prices from the 80's, and labor prices at about 10% over material.. back in the day.. labor might have been 100% of material...

if you live in the south.. this is the cheapest time to get work done.


i had damaged stucco on my house from the hurricanes of 04/05.. got my house re-stucco'd, and painted with good elastomeric paint with a primer and water proofing undercoating for less than 4000$ had an aluminum awning with walk on roof added for near as i can figure, cost of the aluminum plus a couple hundred bucks.

sad times for those of us in the construction industry... scratching around looking for crumbs...

soundguy
 
   / New Driveway- 2 pavement options..help!!
  • Thread Starter
#14  
When I had my driveway done, it was about 6k, and around 6000 sq. ft. This was about 10 years ago before prices took off. I'm guessing the same thing done today would be about 10k.


On my quote, they listed a total sq.ft. of 4150, and they are charging 7K for the single 3" and around 9K for the 2 layer
 
   / New Driveway- 2 pavement options..help!! #15  
That doesn't sound like a bad price. I'm not sure where you are from, but that is a little less than I would have guessed.
 
   / New Driveway- 2 pavement options..help!! #16  
Hello, this is my first post, and I obviously need some help deciding on what way I should go with paving my drivway...

I live in Northeastern PA and we do get some pretty bad winters here... not so bad the past few year though....Our home was built in 2004, the lot was previously a wooded lot. The driveway is completely flat as well..When I had the driveway cut in,(about 4500 sq. ft) I had them excavate down 18" from the surface of the ground, and had it filled with shale to provide a good base. Once the house was complete, I had 40 ton of modified laid down. About 2 years after that when the modified was packed in, I had 40 ton of 2b gravel spread down, and thats whats on there now..Since I now have 2 small children, they need a place to ride their bike, so we decided to get some quotes on paving the driveway..So far I have gotten 3 quotes from reputable contractors in my area, but they gave me two choices...

1. 2 1/2" of binder , with 1 1/2" ID2 wearing surface

or

2. A single 3" layer ..(One contractor said he would use an ID3 compound, (which I assume has some larger rocks mixed with smaller rock) and the other contractor is going to use just ID2 surface for the 3"

Now, all of the contractors, didnt push one or the other, but it seemed like they favored the single 3" layer.. The Two layer is 25% more money than the single layer as well..For my application for a standard driveway, what is best route to take... I dont want to cheap out and have the driveway fall apart, but I dont want to overspend if I dont have to... Looks arent as important to me as durability... Any help would be great.

Your story sounds just like mine. I live in Northern Indiana, about 1/2 way between Toledo and Indianapolis, so our climate is the same. My home was built in 1997. I bought it in 2003 with little or no drive. I brought in 120 tons or so of #53's the first year then each year after that I had about 40 more tons brought in for each of the first 3 or 4 years. Last spring it was getting rough so I got 3 quotes like you.

My drive is 4800 sq ft and what I decided to do was 600 sq ft in 6" of 4000 psi concrete. I have a neighbor with a dump truck so I dug it out with my tractor and then had a company come in and do the pour. Concrete was $1200 and the labor was about $500.

The rest of the drive was put down in asphalt. 2" of heavy binder and 1" top coat smooth finish for 3" total. I had all 3 quotes done the same. The 3 quotes were $11,000, $9,000, and $7,500. I actually liked the cheapest guy the best and the asphalt plant where they all 3 were getting the product is only 3 miles from my home so I went there and talked to them. They said the cheapest guy does lots of work and has WalGreens, Dollar General, and a few other chains on the account. What really sold me was out of the 3 that I talked to the manager of the plant about is they were the only one that PAYS all the bills on time.

I also called the BBB and in 30 years they had 1 complaint. I figure you can not make everyone happy. Anyway, the $7500 price was to grade, compact, and install. I was also told by the owner he had big contracts that he needed to keep happy due to them being the bread and butter of the company and he only picked up residential jobs to fill in down time for his crew. Long story short it took about a month to get to me. Day one they came and graded and compact the job. Day two they layed all the asphalt, day 3 they came and did some final clean up for maybe 2 hours and collect the money.

I payed nothing till the job was done. Anyone who wants something up front does not have the capital or credit to keep a company going so I would run.

Total cost was $10,000 or a little less for 4,800 sq ft of drive of which 600 is concrete at 6" thick and 4000 psi.

One other thing, I asked about a single layer and no one around here would do it. They said it breaks up too much and if you just use base for that layer it lets in too much water and causes cracks with freeze and thaw.

Plowing is a dream now with the rig in my avatar.

Chris
 
Last edited:
   / New Driveway- 2 pavement options..help!! #17  
Just had our driveway redone and a large apron added (Chicago area). They put down 9" of gravel base, 3" of asphalt. For new area including excavation and removal of dirt they charged $3/sf. To tear out and remove existing asphalt drive, build up gravel base and top with 3" asphalt they gave us a flat price that worked out to about $1.50/sf by my calculations. It's a little hard to measure exactly because of irregular shape and a turnaround.

We had them do some work for us 2 years ago and were very happy, and they're local, so we're using them again. Asphalt companies seem to be some of the shadiest contractors around, some of the people we got quotes from scared me, I would never let them on my property alone. They seemed like criminals.
 
   / New Driveway- 2 pavement options..help!! #18  
I work for a paving company in N.E. Pa. and we sometimes do a single lift of I.d. 3 on driveways which is fine , but if you have oil delivery or coal delivery trucks using the driveway in the winter I would go with the two lift option. Plus the finish look should be better.
 
   / New Driveway- 2 pavement options..help!!
  • Thread Starter
#19  
I work for a paving company in N.E. Pa. and we sometimes do a single lift of I.d. 3 on driveways which is fine , but if you have oil delivery or coal delivery trucks using the driveway in the winter I would go with the two lift option. Plus the finish look should be better.

Well, we have a propane truck that comes for delivery, but since my tank is located on the opposite end of the driveway, they just park the truck on the main road.....I really dont have any heavy trucks using my driveway.

Wouldnt the finish look better with the single 3" layer of I.D. 2?
 
   / New Driveway- 2 pavement options..help!! #20  
I believe I.D. 2 is what we call top coat or sometimes 9 MM, I say believe because I don't recall anyone calling it I.D 2. If that is the case I would not use it as only shot. It is made up of smaller stone which gives it that smoother look.
 

Tractor & Equipment Auctions

2009 Chevrolet Impala Sedan (A48082)
2009 Chevrolet...
14ft Flatbed Truck Body (A48081)
14ft Flatbed Truck...
12 FLATBED W/ PRESSURE WASHER FRAME (A50854)
12 FLATBED W/...
2019 Allmand Light tower (A49461)
2019 Allmand Light...
Axle (A50860)
Axle (A50860)
2023 Bobcat T770 Skidloader (RIDE AND DRIVE) (LIKE NEW) (A50774)
2023 Bobcat T770...
 
Top