- Getting old. Sold the ranch. Sold the tractors. Moved back to the city.
Here are a few photos showing the slab construction for my 24x42 ft shop (a metal building with 12 ft high walls, two 10x10 ft rollup doors). The slab is 6" thick, 4000 psi mix, #4 rebar on 24" centers, 6-mil Visqueen vapor barrier over 1/2" gravel base.





Trench for perimeter footings (essential to prevent slab cracking).
You'll need a TLB to dig the trenches and a lot of 2x lumber for the forms.
Good luck.





Trench for perimeter footings (essential to prevent slab cracking).
You'll need a TLB to dig the trenches and a lot of 2x lumber for the forms.
Good luck.