flingwing1969
Platinum Member
- Joined
- Jun 2, 2008
- Messages
- 694
- Tractor
- LS G3038, JD GT275, and Bolins H16
First thing I would do is get some free flow ventilation going. You need to somehow get the eaves and roof ridge ventilated to create a airflow. Maybe install a exhaust/ventilation fan on the top gable ends. As already said ...what are the trusses centered on ( 2',4',8' ) as that will tell you what you can hang from the bottom chord.
They are 8' oc so not a lot of weight on the underside. Part of the building (about a third) will have a mezzanine - primarily for storage. The ceiling above that will be open trusses because I need the height, but that can be insulated with batts between the purlins - this space could be closed off from the rest of the shop and unheated. In that case, I would insulate between the Mezzanine's floor joists before I put in the sub-flooring, making it very easy to handle and just leave the ceiling open and ventilated in that area, hmmm - see, ya got me thinking. Thanks.