Now that the weather finally broke, I got some seat time in. The driveway / private road has been a mud pit. The upwind property was bare and half the dirt blew across/onto the road. The drainage ditches were filled in and a "dirt berm" about 2-3' deep, 8' wide, and 5-600' long formed. The driveway was more like a water channel than a road.
Got out there and scraped off the dirt, used the boxblade to dig up the stone, and regraded it. Then started to dig out the drainage ditches. The adjoining property has a new owner and wants the dirt. So I'm just dumping it over the fence. He'll move it from there. The piles are 5' high. So far about 4 hours on the road, 3 hours on digging the dirt out. Got about 200' done out of the 600'.