Up here they made the farms put in bridges no more crossing thru the water
Boy, the cost escalated quick huh.![]()
Right now I have strep throat and the flu so I can't do anything for a week. I did remove old pipes from crossing Sunday, down to solid bedrock, RR ballast I spread more on other side so no mud.
I'll fix it better in a week.
Upstream I found perfect spot for the pipe. I measured and trees either side about 14 ft. apart and downhill only about 3 ft. to top of pipe. Plenty of dirt around so I think it will work out ok.
I've been there after a heavy rain and I'm sure the 36" pipe will handle it.